Ono Ramp Bridge - List of Manufacturers, Suppliers, Companies and Products

Ono Ramp Bridge Product List

1~1 item / All 1 items

Displayed results

[Scaffolding Construction Achievements] Minamibashi, Ohno B Ramp Bridge, Ohno C Ramp Bridge

Work was carried out from underneath the bridge during both installation and dismantling! There was absolutely no impact on those using the road.

We would like to introduce our construction achievements in the bridge inspections of the Minami Bridge (a four-span continuous RC slab steel girder bridge) on the Hakodate-Mobetsu Road, as well as the Ono B Ramp Bridge and Ono C Ramp Bridge (both three-span continuous steel slab box girder bridges). In the case of inspection work using a bridge inspection vehicle, the Minami Bridge is in a provisional shared section, requiring alternating one-way traffic control, while the Ono B Ramp Bridge and C Ramp Bridge are single-lane ramp bridges, necessitating a complete traffic stop. To avoid the occurrence of these traffic regulations and to minimize the impact on road users, we adopted "rack scaffolding." Since the work was carried out from underneath the bridge during both installation and dismantling, there was no impact on those using the Hakodate-Mobetsu Road. *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • Scaffolding and Support Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Ono Ramp Bridge